How to Draw an Electrical Plan of Your House, Online
An electrical plan shows where the outlets, switches and lights go, where the cables run and which breaker feeds what. People draw one to get a quote from an electrician, to plan a remodel or an addition, or to think through a new room before the drywall goes up. This guide explains how to prepare one, step by step, and how to do it for free in Plan², in your browser, with the length of cable of each circuit worked out for you. Plan² is a planning aid, not a code check: your electrician and the inspector decide what is allowed.
On this page
What an electrical plan is for
An electrical plan is a floor plan with the electrical equipment drawn on it: the panel, the outlets, the switches, the lights and the runs of cable between them. Its first use is a conversation. A contractor who has your drawing can quote on the same list as the next contractor, and you can compare the bids line by line instead of guessing what each one includes.
Its second use is thinking. Drawn before the work, the plan shows the room where there are too few outlets, the long run from the panel to the garage, the circuit that will carry the whole kitchen. Moving an outlet on paper costs a click, and moving it behind a finished wall costs a day.
It also keeps a record. A drawing of where the cables run is worth having years later, when someone wants to hang a shelf or open a wall.
Before you draw: the base and the rules
Start from an accurate floor plan, because the cable lengths and the position of every device depend on it. If you do not have one yet, draw the structure first, as the guide to drawing a house plan explains: walls at their real thickness, openings, rooms. The electrical layer sits on top of that.
Then find out which rules apply to you. In the United States, residential wiring follows the National Electrical Code (NFPA 70), together with the amendments each state, county or city adds, and work usually needs a permit and an inspection through your local building department. Which jobs a homeowner may do, and which need a licensed electrician, depends on where you live. Check with your building department before you start.
About the advice Plan² shows
The advice Plan² displays on the circuits is based on the French standard, NF C 15-100. It is a hint to catch a drawing slip, for example too many outlets on one circuit, and it is not a compliance check under any code. It quotes the French numbers, in metric cable sections and with French breaker ratings, so outside France it does not match the NEC. Read the advice as a prompt to look again, ignore the numbers that do not match your code, and let your electrician decide the real gauge and breaker.
The method: from the walls to the circuits
Draw the structure first
Draw the outside walls, the inside walls, the doors and the windows, and name the rooms. The cables follow the walls, so the base must be right before you add anything to it.
Switch to Electricity mode
Open Layers and choose Electricity. A mode locks the other layers, so you cannot move a wall by accident while placing outlets, and you can still show or hide the layers you want to see.
Place the breaker panel
Put the breaker panel where it really is, or where you want it. The electric meter is in the library too. The panel is the starting point of every circuit, and its position decides the length of every run.
Place the outlets, switches and lights
The Electricity family of the library has outlets (single, double, high-power, weatherproof, TV and network), switches (single and two-way), ceiling lights and wall lights. Pick one, then click the plan. On a phone, place it with the viewfinder: drag the plan under the crosshair and tap Place.
Lay the cables
Draw each cable as a run by tapping points from the panel to the devices it feeds, and finish the run. If the house has more than one floor, a riser joins two floors, so the cable length accounts for the climb.
Make the circuits
Create a circuit for each run. Give it a name and a use (outlets, lighting or dedicated), a breaker, a cable gauge and a color, so you can tell the circuits apart on the plan. A dedicated circuit feeds one appliance only: the range, the dryer, the water heater.
Read the advice and the cable lengths
Plan² shows the length of cable of every circuit, and the advice flags the circuits that look overloaded or mixed up. Treat the advice as described above: a prompt to look again, not a verdict. Fix what is a slip, and note what your electrician should decide.
Export with the legend and measure
Choose File, then Export…, pick the plan type, a PNG or PDF, the paper and the scale from 1:50 to 1:500, and choose which networks to include: over the plan, under it, or apart, with one plan per network. Switch on the legend and measure to print the circuits and their cable lengths. The PDF is vector at true scale.
Good habits when you plan the circuits
These are general habits, not code requirements. Your code and your electrician have the final word.
- Keep circuits short and simple: one that wanders through five rooms is harder to understand, to repair and to extend.
- Do not put the whole house on a few circuits: split lighting from outlets, and keep a separate circuit for each large appliance.
- Group devices by area as well as by use, so that shutting a breaker to work on one room does not turn off the whole floor.
- Think about future needs: a charger in the garage, a workshop, a home office. A spare breaker space costs less than a new panel.
- Place the switches where a hand looks for them, beside the door, on the side of the handle.
- Leave room around the panel: it must stay reachable, and the clearance in front of it is set by your code.
Common mistakes in an electrical plan
- Drawing devices before the walls are right, then moving everything.
- Putting every outlet of a kitchen on a single circuit.
- Forgetting the cable runs between floors, which are the longest.
- Reading the Plan² advice as a verdict: it is a French-based hint, not a check under your code.
- Skipping the legend: without the circuit names and lengths, the electrician has to start over.
- Treating the plan as a permit drawing, when the permit and the inspection go through your building department.
What Plan² does not do
Plan² does not size a circuit, check a drawing against the NEC or any other code, or replace an electrician or an inspection. Its advice is indicative. It does not draw wiring diagrams or panel schedules, and it does not draw sections, elevations or heights, which are coming. What it does is give you a clear drawing of where everything goes, circuit by circuit, with the cable lengths worked out, which is what a contractor needs to quote.
Frequently asked questions
Can I draw an electrical plan for free online?
Yes. Plan² runs in your browser with no account: draw the structure, switch to Electricity mode, place the panel, the outlets, the switches and the lights, lay the cables and make the circuits. Then export the plan as a PNG or a PDF, with a legend that lists the circuits and their cable lengths.
Does Plan² check my plan against the NEC?
No. The advice Plan² shows is based on the French standard and is only a hint to catch a drawing slip. It does not check compliance with the NEC or any local code. Your electrician and your building department decide what is allowed, and the numbers that do not match your code should be ignored.
Can I use the plan to get quotes from electricians?
Yes, that is one of its best uses. Give each electrician the same exported plan, with the legend and measure, and the quotes will cover the same list. The cable length of each circuit helps them estimate the job. They will confirm the real layout and gauges on site.
Do I need a permit for electrical work?
Often, yes, and it depends on where you live and on the job. Many places require a permit and an inspection, and some limit what a homeowner may do without a licensed electrician. Ask your local building department before you start. A clear plan makes the conversation easier.
How do I show the wiring between two floors?
With a riser, which joins two floors. Draw the cable run on the first floor to the riser, then continue the run on the other floor, so that the cable length includes the climb. Floors are the tabs of the editor, and you can show the neighboring floor faintly to line things up.